Works Overview: Pontoon Provider was tasked to supply a movable, floating workforce access to an inaccessible brick wall on a user-friendly, public access river.

&CHALLENGES FACED:

  • - Design a platform that had movable sections of working area.
  • - Limited installation area.
  • - Design to fit a curved wall – to stop debris falling in the water, Pontoon Provider’s design had to snugly build the pontoon so that it sat close to the wall and wrapped around a corner.
  • - To leave enough of the navigable river free for river users whilst maintaining safe access on the working platform.

 

WHAT WE DID:

  • - Initial site visit to establish all known areas of work.
  • - Install a 50m x 2m floating walkway to the working site for safe and simple access.
  • - Designed platform walkway with a movable working platform for easy access.
  • - Install mooring eyes on the wall face for secure mooring.
  • - Installed a signed and buoyed zone perimeter on water to ensure a safe water course for river users.
  • - Lighting the pontoon. Ensuring evening and night river users could see the pontoon.

RESULTS: NO CAUSE FOR CONCERN! DIFFICULT SITE OBSTACLES OVERCOME WITH BESPOKE DESIGN AND ASTUTE PROJECT MANAGEMENT.

Pontoon Provider specified that the project was organised in the Autumn, ensuring all work could be completed with good air temperatures. The 50m x 2m bespoke floating walkway played a crucial part in enabling safe and efficient access for the workforce as well as all sorts of tools, machinery and scaffolding. Project completed successfully on time and on budget, with no cause for concern.

EQUIPMENT USED:

  • - Rear mounted Hiab wagon
  • - Bespoke designed 150 square meter CUBISYSTEM pontoon(s).
  • - A Rigiflex vessel coupled with a 15hp engine.
  • - 2 RYA Certified Operatives

HOW TO BOOK YOUR PONTOON HIRE

We Supply Walkways and Docks As Well As Pools, Floating Bridges and Platforms, guaranteed to take your project or event to that next level.